Headwaters of the Shenandoah River Watershed Assessment & Pilot Restoration

2024-07-12T12:19:42-04:00

Shenandoah Headwaters Watershed Assessment & Pilot Restoration Bergton sits near the confluence of the German River and Crab Run, headwater streams of the North Fork of the Shenandoah River, which flows into the Shenandoah and the Potomac River before reaching the Chesapeake Bay. The North Fork represents 18% of Virginia’s contribution to the Chesapeake Bay [...]

Murray Run

2024-07-12T12:17:56-04:00

Ecosystem Services has collaborated with HHHunt and Roanoke County to develop the first stream restoration project funded through a public private partnership. The proposed project consists of restoring approximately 1,250 linear feet of Murray Run adjacent to the Pebble Creek Apartments in Roanoke County, Virginia ...

Glasgow Watershed Assessment and Stormwater Design

2024-07-12T12:12:57-04:00

Glasgow Watershed Retrofit Prioritization & Stormwater Design In 2015, the Town of Glasgow partnered with the Central Shenandoah Planning District Commission  and  Ecosystem Services to implement a NFWF Technical Capacity grant for conducting the Town of Glasgow Watershed Retrofit Prioritization Project. Led by Ecosystem Services’ science and engineering team, a field based study characterizing the [...]

Edith J. Carrier Arboretum at JMU

2024-07-12T12:20:34-04:00

A stream and wetland restoration project was designed and permitted by Ecosystem Services, LLC to help meet both the MS4 pollutant reduction goals of JMU and aesthetic and educational goals of the Arboretum. Outreach and environmental education was provided to JMU faculty staff, students, and others ...

Greening of Crittenden Street

2024-07-12T12:29:54-04:00

Greening of Crittenden Street With a population of 1,488, Edmonston is bisected by the Northeast Branch of the Anacostia.   Due to its low point on the watershed, Edmonston and its residents have experiences flooding during heavy rain events, including the 5200 block of Crittenden (the block closest to Kenilworth Avenue). Ecosystem Services was hired [...]

Kilmarnock Outfall Restoration

2024-07-12T12:20:52-04:00

Kilmarnock Stream Restoration & Severe Gully Erosion Remediation Many sites within the Town of Kilmarnock were developed prior to consideration of stormwater runoff and its negative effects on water quality. To address the issue, the Town started implementing strategies identified in the Watershed Assessment Report. The eroded gullies in Kilmarnock were washing an extreme [...]

Angel Rose Wetland Restoration

2024-07-12T12:13:16-04:00

Angel Rose Wetland Restoration A wetland mitigation project located on a privately-owned farm, within the Southern Coastal Plain of Virginia in Sussex County, VA. The property is situated along the state scenic Nottoway River. The property is currently in agriculture with the potential  to restore approximately 233-acres of existing ditches and floodplain cropland into coastal plain [...]

Blue Leaf

2024-07-12T12:18:12-04:00

Blue Leaf The Town of Christiansburg contracted us to develop restoration plans for a degraded urban stream system. This creek is a tributary of Crab Creek and other sections have previously been restored downstream. Now efforts are directed to the most upstream extent of the creek. The highly urbanized drainage area, steep gradient, and [...]